The process typically involves a site assessment, system design, obtaining permits, installation by certified electricians, inspection, and final connection to the grid or battery system.
The actual installation usually takes 1–3 days depending on the system size. However, the entire process (including permits and approvals) may take 2–6 weeks.
Panels work at reduced efficiency on cloudy days and do not generate electricity at night. However, systems can be paired with batteries to store excess energy for later use.
Most roofs are suitable if they have good sun exposure and structural integrity. South-facing roofs perform best (in the Northern Hemisphere).
Every 3–5 years for residential properties or after major renovations. Commercial systems may need more frequent inspections.
No major changes are needed. The solar system connects through your electrical panel and is integrated by a licensed electrician.